top of page
OUR CLIENTS
Our valued projects
Serving industry leaders
Client | Project Name |
|---|---|
Enterprise | FE SP Install Flush Connection |
Enterprise | Colonial Pig Trap Controls |
Enterprise | E. Storage Brine Piping (23-1113) |
Enterprise | Frac XII Argus Valve Modification |
Enterprise | ATEX-Aegis Pump Station |
Enterprise | PDH2 Water Injection |
Enterprise | IBDH Chlorine System Upgrade |
Enterprise | Splitter IV |
Enterprise | H2 Recovery Compressor Pressure Protection |
Enterprise | North Frac Disposal Well Pumps Recirc Line |
Enterprise | East Storage Valve Replacement |
Enterprise | Port Arthur VCU Foundation |
Enterprise | Skelly-Belvieu to CP Chem Jumper |
Enterprise | FE W PHT ISOM C5 Fungible C5 |
Enterprise | REF III Debottlenecking |
Enterprise | EHT Bottleneck Manifold |
Enterprise | OTH 15 Surge Line |
Enterprise | NPA Overfill Phase II Rev. 1 |
Enterprise | Filter Job for Steve Thompson |
Enterprise | Ongoing Maintenance for Marvin Thrasher |
Enterprise | NPA Tank Platforms |
Enterprise | Sealy Chemical Pump Installation with Hot Tap Prop. Rev. 1 |
Enterprise | EHT - Refrig IV |
Enterprise | FE-2024 WGS Cavern 4 Workover (Retainage) |
Enterprise | ECHO S7 Connection Civil-Structure High Rack Rev.1 |
Enterprise | FE-MP Propylene Compressor |
Enterprise | FE-MP Ethane Compressor |
Enterprise | FE PPS-I KOH Treaters Platform |
Enterprise | Recommissioning LID 42668 |
Enterprise | Freeport Bulkhead Backfill |
Enterprise | FE IBDH RED KV Valve Upgrade |
Enterprise | Eldorado Debottleneck |
Enterprise | HD5 Blending Pumps Recirc. Lines |
Enterprise | Compressor Anti-Surge Valve Controller Rev. 1 |
Enterprise | HSC 30" Firewater Line Cleaning |
Enterprise | Baytown Electrical |
Enterprise | Amine Phase 1 & 2 Rev. 1 |
Enterprise | MP HPIB - Hydro Test - Morgan's Point |
Enterprise | Appelt New Surge System Phase III |
Enterprise | 2024 GCF Reactivation (Retainage) |
Enterprise | LEF Condensers Backflush |
Enterprise | LEF Vessel Demo and Install |
Enterprise | Low CO2 Meter Skid |
Enterprise | N.S. LouTex PSV |
Enterprise | Tank Blending Hydro/Pipe Mod. & Civil/Structural for El Dorado Terminal |
Enterprise | Texas City Control Room Offloading |
Enterprise | VCU Civil-Structural |
Enterprise | Sasol Lake Charles Ethylene |
Enterprise | PDH 2 Crack Repairs |
Enterprise | Carbon Steel Natural Gas Line Connector & Tank 1028 VCU Vapor Recover |
Enterprise | ECHO Surge Relief |
Enterprise | Tank 200-11 Foam Ring Replacement |
Enterprise | EHT 8" Cooldown Line |
Enterprise | ETC C2 Connection to WS Rev. 2 |
Enterprise | PDH 2 Heater Fall Protection |
Enterprise | PDH 2 Reactor Effluent Filters A&B |
Enterprise | N. Storage Shin Oak Vibrations |
Enterprise | PIP P-12 Upgrade Phase 1 & 2 Rev. 1 |
Enterprise | HSC Firewater Line Repairs |
Enterprise | North Fracs Instrument Air Line |
Enterprise | Prevention of Hydrate Form |
Enterprise | Appelt Platform Phase 1, 2, 3, and Line Demo |
OneOk | OMBS Line 6 |
OneOk | Well 17 Leach Piping |
OneOk | Exploratory Hydro Vac |
ETC | US 77 Casing Extension |
Exxon | TX 212A HDD |
ETC | Fire Station |
Energy Transfer | Meter Drain Pump Reroute Frac's 1, 2, 3 |
Energy Transfer | Hwy 149 Extension |
Exxon | LS - TX-113 12" Reduction |
Energy Transfer | FM 646 |
Energy Transfer | HCED 4" Abandonment |
OneOk | Leach Plant Upgrades |
Exxon | TX-113 12" Reduction |
Energy Transfer | B 234 Bore |
Exxon | TX-112 Hwy 6 Regan HDD |
Exxon | Rosenburg Pump Mods |
Exxon | DOE 2024 |
Get a quote for your upcoming project
bottom of page










